Facility Information
Shop
Size
- Bay 1 (High Pressure) - 13,800 Sq. Ft.
- Bay 2 (Low Pressure/GE) - 17,172 Sq. Ft.
- Bay 3 (Small High Pressure/Low Pressure) - 28,836 Sq. Ft.
- Covered Loading Dock/Grit Blast and Paint - 10,440 Sq. Ft.
- Total Shop Size - 70,248 Sq. Ft.
Crane Capacity
Heat Treatment
Capable of Stress Relieving, Normalizing, Normalizing and Tempering carbon and
low alloy materials at temperatures between 1100F° - 2000F°.
Blast/Paint
Indoor grit blasting booth and paint area.
Machining/Drilling
Includes Boring Mills, Lathes, Drill Press and Band Saws.
Bending
Hot and Cold bending capabilities.
Welding Equipment
Includes machines for GTAW, SMAW, FCAW, GMAW and SAW
Welding Engineering
All Welders/Welding Operators are qualified and certified in accordance with ASME Section IX. Parts and Machinery currently has welder/welding operators qualified to perform GTAW, SMAW, GMAW, FCAW and SAW welding processes.
Welding Procedures
| P1 Material |
GTAW, SMAW, GMAW, FCAW and SAW
Deposit thinkness of 8 inches. Heat Treated and As-welded.
|
| P4 Material |
GTAW, SMAW, GMAW, FCAW and SAW
Deposit thinkness of 8 inches. Heat Treated and As-welded.
|
| P5A Material |
GTAW, SMAW, GMAW, FCAW and SAW
Deposit thinkness of 8 inches. Heat Treated and As-welded.
|
P5B Material (P91) |
GTAW, SMAW, GMAW, FCAW and SAW
Deposit thinkness of 8 inches. Heat Treated condition only.
|
| P8 Material |
GTAW, SMAW, GMAW, FCAW and SAW
Deposit thinkness of 8 inches. Heat Treated and As-welded.
|
| Bi-Metal |
All P-Groups and processes listed above for a deposit thickness of 8 inches. |
|